facebook



Click on each thumbnail to enlarge the image.

The album contains 17 photos

004.JPG
Raising the roof to match the existing home.
005.JPG
Progress on the roof continues
006.JPG
Finished front of one of the reconstructed homes.
007.JPG
Work on the back of the home begins.
008.JPG
Bricks and support beams in!
009.JPG
Even the roofs of the 8 homes needed repair.
010.JPG
Electrical work being brought up to code.
011.JPG
Interior shot of the roof work.
012.JPG
Masonry work begins on the elevated portion of the house.
003.jpg
The Cardoza family
house 1 (2).JPG
Adding the front porch.
house 1 (5).JPG
Finishing electrical work.
house 1 (9).JPG
Interior shot of raised roof.
house 1 (10).JPG
Work continues on front porch.
house 1 (11).JPG
Back of house, just needs paint.
house 2 (2).JPG
Support beams for front porch.
patio house 1 & 2 (2).JPG
Beams for back porch.